This Concept Plan was
created by the GRA. To do so, we began with a site map of the DPW
property, then overlayed the existing conceptual plan
from the Glen
Lake property plan, as prepared by the School District’s architect. As
you can see, only
slight changes have been made to the alignment of the entrance roadway and the
location of parking to make the geometry fit this site. Note that
this
site can easily accommodate a kindergarten and elementary school, as well
as a playground, softball field, soccer field and additional parking.
These athletic fields would help to fulfill the need for additional
recreational facilities in our town. The site also could accommodate
substantial overflow parking along the access roadway during special
events at the school. This layout also allows for future expansion of
the school buildings in many different directions and configurations.
This plan also shows a full perimeter roadway with connection to a
separate emergency access route.
|
GRA's Concept Plan
for DPW SITE, Map 5, Lot 24
(Note that
wetlands impact is 0%.)
This
is not intended to represent a final design but merely to illustrate one
possible layout on the property. One
can easily imagine that reconfiguring the buildings and parking would
allow for additional areas for buildings, recreational areas or other
features. |